My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-08_REVISION - M2006080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006080
>
2008-10-08_REVISION - M2006080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:19 PM
Creation date
5/26/2011 8:16:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006080
IBM Index Class Name
REVISION
Doc Date
10/8/2008
Doc Name
Slurry Wall Constr. Rpt.- Pt.1
From
Loveland Ready-Mix Concrete
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Slump of backfill was originally specified to be between five and seven inches. After a <br />discussion between Lyman Henn and WRS Compass, the specified slump of the backfill <br />was changed to be between 4 and 6 inches on April 3, 2008. The Contractor was notified <br />when slump was out of specification and adjusted the backfill accordingly by either adding <br />slurry or soil. The Contractor specifically maintained the slump on the lower side of the <br />specification so as to keep the toe of the backfill from constantly sliding into working area <br />when excavating. <br />4. The change in direction of the slurry wall at approximate station 47 +60 was originally <br />intended to be a cross but was turned into a radius corner. This radius began at <br />approximately station 45 +50 and was back on the original alignment by approximately <br />station 48 +00 (contractors stationing). <br />GAPROJECI7S\107021-000 Loveland Ready Mix Slurry Wall\R. Records and Correspondence\R.11 ReportskAs-Built report stuffiAs-built report_Final.doc 6
The URL can be used to link to this page
Your browser does not support the video tag.