My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-23_REVISION - M1983011 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983011
>
2011-05-23_REVISION - M1983011 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:45 PM
Creation date
5/25/2011 8:35:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983011
IBM Index Class Name
REVISION
Doc Date
5/23/2011
Doc Name
DWR comments
From
DRMS
To
Mt. Elbert Mining Co., LLC
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />John W. Mckenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director/State Engineer <br />Response.to Reclamation Permit Conversion Application Consideration <br />DATE: May 23, 2011 <br />TO: Dustin M. Czapla, Environmental Protection Specialist <br />CC: Division 2 Office; District 11 Water Commissioner <br />FROM: Caleb Foy, E.I.T. <br />RE: Willow Creek Mine, File No. M-1983-011 <br />Operator: Mt. Elbert Mining Co., L.L.C. <br />Contact: Kay Blecha, (303) 286-8688 <br />Secs. 5 & 6, Twp. I 1 S, Rng. 80W, 6" P.M., Lake County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />® The proposed operation will consume water by: ? evaporation, ® dust control, <br />? reclamation, ? water removed in the mined product, ® processing, ? other:. <br />® Other: The water consumed by this operation is leased from the Board of Water Works of Pueblo <br />and shall be subject to the conditions set forth in the Division 2 Engineer's April 11, 2011 <br />administrative exchange approval letter. <br />COMMENTS: According to the-application materials, this is a dry mine operation and ground water will <br />not be exposed. Consumptive use of water will occur during sluicing and as dust suppression on the haul <br />road, stockpiles, and working face, and such water will be leased by the applicant from the Board of Water <br />Works of Pueblo. An administrative exchange was approved by the Division 2 Engineer, Steven J. Witte, on <br />April 11, 2011, which allows for the diversion and consumption of a leased water supply (from the Board of <br />Water Works of Pueblo) of up to 60 acre-feet from April 1, 2011 - October 31, 2011, with water depletions <br />estimated to be no more than 15 acre-feet. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.water.state.co.us
The URL can be used to link to this page
Your browser does not support the video tag.