My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-23_ENFORCEMENT - M1984014
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1984014
>
2011-05-23_ENFORCEMENT - M1984014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:43 PM
Creation date
5/25/2011 7:11:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984014
IBM Index Class Name
ENFORCEMENT
Doc Date
5/23/2011
Doc Name
Memorandum
From
DRMS-GRM
To
MLRB
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE CAF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />December 7, 2010 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Glenn Williams Bill Ritter, Jr. <br /> Governor <br />Cotter Corporation <br />P <br />O <br />Box 700 Mike King <br />. <br />. Executive Director <br />Nucla, CO 81424 <br /> Loretta E. Pineda <br /> Director <br />RE. JD-8 Mine, Permit No. M-1984-014, Notice of Required Environmental Protection Plan (EPP) <br />Amended. <br />Dear Mr. Williams, <br />Cotter Corporation legal consul has raised a question regarding dates of compliance for issues at the JD- <br />8 Mine. The original letter sent out on October 21, 2010 noted dates of compliance that were based off <br />the inspection report created the previous day while the letter noted actions were required by the date <br />of the letter. The Division of Reclamation, Mining, and Safety (the Division) is clarifying that the due <br />dates for compliance are from the date of the original letter, October 21, 2010 not the dates noted in <br />the report. Staff regrets any confusion on the issue and is giving Cotter the extra day created by the <br />error. Therefore, please review and note the amended dates of compliance noted below. <br />On September 23, 2010 the Division of Reclamation, Mining, and Safety (the Division) inspected the 1D-8 <br />Mine as part of its normal monitoring program. The JD-8 Mine is a 112-d, Designated Mining Operation <br />(DMO) permit. The Division notes the existence of a stockpile of 300 to 500 tons of uranium ore that <br />has been on site since at least April 2, 2008. At that time, the Division requested that the stockpile be <br />enclosed by berms to prevent stormwater interaction and to contain ore sedimentation. The <br />September 2010 inspection noted that the berms were not placed or had been removed. Site <br />conditions noted the interaction with stormwater and sedimentation fans from or near the stockpile <br />that suggested ore fines were potentially leaving the immediate area. <br />As an interim measure, the Division required Cotter to immediately install berms completely around the <br />stockpile to prevent further excursions of sedimentation and interaction with stormwater. The task was <br />completed within 30 days of the original letter, November 17, 2010. Division staff verified the berms <br />were in place on the 17th. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.