Laserfiche WebLink
May 11, 2011 C- 1981- 008/New Horizon Mine MLT <br />Water Tank <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 Page 13 of 14 <br />Photo 10 — Electronic rain gauge installed at Pond 009 <br />Photo 11 — Pond 011 and elevated water tank, looking NE <br />