Laserfiche WebLink
List of Tables (Continued) <br />List of Figures <br />Page <br />Table 29 <br />Parameters of Column Leach Tests ................................ ............................... ........................2.05 <br />-65 <br />Table 30 <br />Leaching Data for Coal Refuse ...................................... ............................... ........................2.05 <br />-67 <br />Table 31 <br />Results of Chemical Analysis ........................................ ............................... ........................2.05 <br />-70 <br />Table 32 <br />Time Variation of Quality of Effluent from Backfill Channel ...................... ........................2.05 <br />-74 <br />Table 33 <br />Effect of Backfill Quality of Alluvial Groundwater ...... ............................... ........................2.05 <br />-77 <br />List of Figures <br />TR -56 Page v Revised 4/11 <br />Page <br />Figure 1 <br />Generalized Stratigraphic Section of the Permit Area .... ............................... .......................2.04 <br />-10a <br />Figure la <br />Regional Map Showing Location of Project Area, Previous Survey and Cultural Features.2.04 <br />-6 <br />Figure 2 <br />Estimated Life -of -Mine plan area ................................. ............................... .........................2.05 <br />-4 <br />Figure 2a <br />Water Distribution Typical Vault Construction Detail ................................. ........................2.05.5b <br />Figure 2b <br />Typical Concrete Encased Electrical Duct Bank Construction ..................... ........................2.05.5d <br />Figure 2c <br />Apache Canyon Airshafts ............................................. ............................... .........................2.05 <br />-8 <br />Figure 2d <br />Substation and Rock Dust System Cut Runoff Routing Detail ...................... .......................2.05 <br />-10b <br />Figure 2e <br />Development Waste Disposal Area Runoff Routing Detail ........................... .......................2.05 <br />-10c <br />Figure 3 <br />Typical Embankment Cross Section .............................. ............................... ........................2.05 <br />-12 <br />Figure4 <br />Water Flow Sheet ........................................................... ............................... ........................ <br />-13 <br />Figure 5 <br />Pond 001 Design ( TR- 49) ............................................... ............................... ....................... <br />-16 <br />Figure 5a <br />Pond 001 Design ( TR- 49) ............................................... ............................... .......................2.05 -16 <br />Figure 6 <br />Proposed RDA Configuration ........................................ ............................... ........................2.05 <br />- 3 0 <br />Figure 7 <br />RDA Conceptual Fill Configuration .............................. ............................... ........................2.05 <br />-31 <br />Figure 8 <br />RDA Generalized Cross Section .................................... ............................... ........................2.05 <br />-32 <br />Figure 9 <br />RDA Benched Keyway Cut ........................................... ............................... ........................2.05 <br />-33 <br />Figure 10 <br />This Figure Deleted by TR -41 ....................................... ............................... ........................2.05 <br />-34 <br />Figure 11 <br />RDA Cross Section A -A' Final Configuration ............... ............................... ........................2.05 <br />-35 <br />Figure 12 <br />Grain Size Distribution, Coal Processing Waste ............ ............................... ........................2.05 <br />-38 <br />Figure 13 <br />Plan and Detail of Proposed Development Waste Disposal Area .................. .......................2.05 <br />-44a <br />Figure 13a <br />Approximate Original Contour Section for the Rock Dust Bin Cut Area ...... .......................2.05 <br />-46b <br />Figure 14 <br />Cut Slope Detail with Map 15 References Showing Disturbance Boundary Change ........... <br />2.05 -46c <br />Figure 15 <br />Typical Lower Permanent Seal ...................................... ............................... ........................2.05 <br />-52 <br />Figure 15a <br />Piping for Recycling of Slurry ........................................ ............................... .......................2.05 <br />-52a <br />Figure16 <br />Typical Airshaft Seal ..................................................... ............................... ........................2.05 <br />- 53 <br />Figure16a <br />Typical Borehole Seal ..................................................... ............................... ....................... <br />-53 <br />Figure 17 <br />Raptor Proof Powerpole Design .................................... ............................... ........................2.05 <br />-56 <br />Figure 18 <br />Electrical Conductivity as a Function of Effluent Volume ........................... ........................2.05 <br />-68 <br />Figure 19 <br />Detail of Mine Plan and Subsidence Related Features ... ............................... ........................2.05 <br />-92 <br />TR -56 Page v Revised 4/11 <br />