Laserfiche WebLink
Page 2 of 3 <br />6.4 SPECIFIC EXHIBIT REQUIREMENTS - REGULAR 112 OPERATIONS <br />The following items must be addressed by the applicant in order to satisfy the requirements of C.R.S. <br />34-32.5-101 et seg. and the Mineral Rules and Regulations of the Mined Land Reclamation Board: <br />6.4.3 Exhibit C - Pre-Mining and Mining Plan Maps of Affected Land <br />4. The copy of Exhibit C - Pre-Mining Plan Map submitted by the Applicant in the permit application did <br />not indicate the following land and structure owners. Please revise Exhibit C to indicate the following <br />owners: <br />a. Merit Energy <br />b. Xcel Energy <br />c. Town of Firestone -Road Right-Of-Way <br />5. Please revise the list of adjoining surface owners of record as shown on Exhibit C - Pre-Mining and <br />Mining Plan Map to indicate the following: <br />a. The address for American Telephone & Telegraph Co. <br />b. The names and address for the residential structures labeled "S15" on Exhibit C. <br />6.4.5 Exhibit E - Reclamation Plan <br />6. Please define the term "agricultural stockpiles" used by the Operator on page 2 of Exhibit E - <br />Reclamation Plan. <br />The Operator states equipment and correlated processing of materials for recycling will remain in Area <br />3 as part of the revised reclamation plan. The Operator stated during the Pre-Operational inspection <br />for the amendment (AM-02) the recycling equipment, concrete stockpiles and asphalt stockpiles would <br />be removed from the site as part of reclamation. Please revise the proposed reclamation plan to <br />indicate the recycling equipment and stockpiles will be removed from the site. <br />6.4.12 Exhibit L - Reclamation Costs <br />8. The Division prepared a reclamation cost estimate for the Varra Resources Project 110 based on the <br />information provided by the Applicant in the amendment application. The Division estimates the total <br />cost to reclaim the site is $87,788.70. A copy of the estimate is enclosed for your review. The Division <br />currently holds a financial warranty in the amount of $87,200. The Division will reduce the <br />amendment cost estimate to match the current financial warranty amount. <br />6.4.13 Exhibit M - Other Permits and Licenses <br />9. Please commit to providing the Division with any of the approved permits and licenses required for the <br />Varra Resources Project 110 site. <br />2