My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-24_REVISION - M1984036
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984036
>
2011-05-24_REVISION - M1984036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:11:57 PM
Creation date
5/24/2011 11:21:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
REVISION
Doc Date
5/24/2011
Doc Name
Adequacy Review
From
DRMS
To
Varra Companies, Inc.
Type & Sequence
AM2
Email Name
PSH
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Replace Topsoil - 10.5 Acres <br />Varra Resource Project 110 Permit Action: <br />Site: (formerly Dakolios Pit No. 1) AM-02 Permit/Job#: M1984036 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 5/23/2011 County: Weld <br />User: PSH <br />Agency or organization name: DRMS <br />HOURLY EQU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />1PMENT COST <br />Cat D8R Series II - 8SU (2005) <br />310 <br />Semi-Universal <br />NA <br />1 per day <br />(CRG) <br /> Utilization % <br />Ownership Cost/Hour: $39.08 NA <br />Operating Cost/Hour: $87.10 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $164.67 <br />Total Fleet Cost/Hour: $164.67 <br />MATERIAL Q UANTITIES <br />Initial Volume: 8,470 <br />Swell factor: 1.215 <br />Loose volume: 10,291 LCY <br />Source of estimat ed volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />400 feet <br />183.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />4,820 feet <br />1,600 lbs/LCY <br />weight dQsrription: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Abbreviation: None <br />Filename: M036-002 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.