Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Backfil18.3 Acres with 2' of fill <br />Varra Resource Project 110 <br />Site: (formerly Dakolios Pit No. 1) <br />PROJECT IDENTIFICATIO <br />Task #: 001 <br />Date: 5/23/2011 <br />User: PSH <br />Permit Action: <br />AM-02 <br />N <br />State: Colorado <br />County: Weld <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br /> <br />Basic Machine: Cat D8R Series II - 8SU (2005) <br />Horsepower: 310 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $39.08 NA <br />Operating Cost/Hour: $87.10 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $164.67 <br />Total Fleet Cost/Hour: $164.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 26,782 <br />Swell factor: 1.000 <br />Loose volume: 26,782 LCY <br />Source of estimated volume:- Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />200 feet <br />491.9 LCY/hr <br />Consolidated stockpile 1.0 <br />4.820 feet <br />0 lbs/LCY <br />?Neight de???rintion: Sand and ;ray-1 -• Dry <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Permit/Job#: M1984036 <br />Abbreviation: None <br />Filename: M036-001 <br />CIRCES Cost Estimating Software