Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director/State Engineer <br />Response Reclamation Permit Conversion Application Consideration <br />DATE: May 20, 2011 <br />TO: ,oJ'ared L. Ebert, Environmental Protection Specialist <br />CC: Division 2 Office; District 19 Water Commissioner FROM: Caleb Foy, E.I.T. C? ?/'?' F <br />RE: The Broyles Pit, File No. M-2004-028l?ivi+o+' d S # t¢ <br />Operator: Febbraro Construction Co. mining an <br />Contact: Joseph Febbraro Jr., (719) 846-7789 <br />Sec. 7, Twp. 32S, Rng. 61W, 6`" P.M., Las Animas County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />COMMENTS: <br />Office of t4tate Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.water.state.co.us