My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-19_PERMIT FILE - P2011012
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011012
>
2011-05-19_PERMIT FILE - P2011012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:40 PM
Creation date
5/20/2011 9:07:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011012
IBM Index Class Name
PERMIT FILE
Doc Date
5/19/2011
Doc Name
New NOI application 2nd copy
From
RM Potash
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil appears to vary from 0 to 10 inches in the areas of proposed disturbance. Topsoil <br />will be scraped aside before excavation and stockpiled. After recontouring of disturbed <br />sites the topsoil will be redistributed with a dozer or excavator a its approximate origins <br />depths <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Any drill hole which encounters a sedimentary rock aquifer shall be sealed, utilizing a high <br />quality sodium bentonite type gel, specifically developed for use as an abandonment fluid, or <br />an equivalent material or technique as approved by CDRMS. <br />GasiRg set at about 5500 feet depth, before oering GpeFatioRG GGMMenGe, well be Femoved to <br />the extent possible. Plugging will be performed to isolate aquifers from cross-contamination. <br />Surface casing will be cut off at the level of the top of the drill site, and closed with a cement <br />pug. In the reclamation o the drill site this cement surface plug will be buried with soil. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Drill sites and drill roads will be re-graded and re-contoured with equipment appropriate to <br />return the disturbed land as closely as possible to its original contour. Topsoil, striped and <br />disturbance saved at the initial site, re-contoured over the <br />Fe gFaded site. The sites and Feads will then be Feseeded 13Y bFeadeasting an appFeved <br />sPPd mix, anti the sail will hP rompactAd nVPr the RPpri with the trPari or tirPS of the <br />re-grading and re-contouring equipment. <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Drill rote!; qnd drill rQ2dR Will be re-graded and re-canta, -red with equipmept appropriate to <br />return the disturbed land as closely as possible to its original contour. Topsoil, striped and <br />saved at the initial disturbance of the site, will be spread and re-contoured over the <br />re-graded site. The sites an roads will then be reseeded by broadcasting an approve <br />seed mix, and the soil will be compacted oveF the seed with the head ol ties of tile <br />re-grading and re-contouring equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.