My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-19_PERMIT FILE - P2011012
>
Day Forward
>
Permit File
>
Prospect
>
P2011012
>
2011-05-19_PERMIT FILE - P2011012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:40 PM
Creation date
5/20/2011 9:07:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011012
IBM Index Class Name
PERMIT FILE
Doc Date
5/19/2011
Doc Name
New NOI application 2nd copy
From
RM Potash
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (FOR Public filing) <br />11. Describe proposed surface excavation or other land disturbre, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Six possible drill-sites are being proposed for NEPA clearance; from these sites one to three <br />sites will be selected for drilling in Phase 1; see RM Potash Map 2 for approximate locations; <br />see Potash Maps 3-,4-,-an-d-5-for accurate ocations on 24,000 scale USGS topo maps. <br />Please also see Pioject Desutiption, Statement 11 in the "Attached Statements" <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 3.00 Average Width 100.00 (ft) Average Length 100.00 ( ft) <br />B. Drill Holes: Quantity 3.00 Depth 6,000.00 (ft) Diameter 6.00 (in) <br />C. Mud Pits: Quantity 3.00 Average Width 20.00 (ft) Average Length 30.00 (ft) <br />Average Depth 10.00 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />drill sites, drill holes, and access roads as described in Project Description <br />F. Other Disturbances (please describe): <br />drill sites, drill holes, and access roads as described in Project Description <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />approximately 500 gallons diesel fuel for the drill rig, to be stored in a tank within a lined pit capable of <br />holding the entire contents; throughout drilling operations <br />*Mately 25000 gallo, is of diesel oil for inetkii ig diesel-inud, to be stored in a tank within a lined Vit <br />enable of holding the entire contents; necessary only in the coring operation from 5500 to 6000 feet <br />F. New Road(s): Length 300.00 (ft) Width 10.00 (ft) <br />Significantly Upgraded Road(s) Length, g_200.On (ft) Width 1()-OIL (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />new road construction will depend on which drill-sites are selected; improvement of <br />existing roads will also depend on site selection; maximum figures are given above. <br />Culverts may be necessary as improvements to existing access to site RMP-6
The URL can be used to link to this page
Your browser does not support the video tag.