Laserfiche WebLink
Colorado Department of Public Health and Environment emszw <br />Air Pollution Control Division Page 5 of 6 <br />- MINING OPERATIONS - <br />K. FINISHED PRODUCT STOCKPILES <br />Maximum Stored At One Time: 2,000 Tons <br />Proposed Controls For Finished Product Stockpile: <br />? Watering Times/Day <br />? Chemical Stabilizer <br />? Compacting Of Piles <br />? Enclosures Type: (Complete or Partial) <br />? Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />x Other (specify) MATERIAL IS DAMP <br />L. RAW MATERIAL TRANSPORT FROM REMOVAL SITE TO STOCKPILE(S) <br /> <br />Haul road distance (one way) 800 Feet <br />Road surface silt content (if known) 0 % <br />Posted speed limit on haul road 20 m.p.h. <br />? Watering <br />? Frequent (Watering Frequency of 2 or More Times Per Day) <br />11 <br />Other: <br />1 <br />2 <br />3 <br />4 <br />Vehicle Type <br />18-Wheelers <br />2 10-Wheelers <br />3 4-Wheelers <br />4 <br />? As Needed <br />Chemical Stabilizer <br />Gravelling <br />ROADWAY AND RAW <br />MATERIAL ARE DAMP <br />Ca aci <br />0 Tons <br />0 Tons <br />4.5 Tons <br />Tons . <br />Empty Weight <br />Tons <br />Tons <br />16.5 Tons <br />Tons <br />M. FINISHED PRODUCT TRANSPORT (ON SITE) <br />No. Of Trips Per/Day <br />44 <br />Amount of material for off-site transfer: 0 Tons per year <br />On-site haul road distance (one way) 800 Feet <br />Road surface silt content (if known) 0 % <br />Posted speed limit on-site: 20 m.p.h. <br />? Watering <br />? Frequent (Watering Frequency of 2 or More Times Per Day) <br />? As Needed <br />? Chemical Stabilizer <br />? Gravelling <br />? Paving <br />Other: DAMP MATERIAL <br />Vehicle Type Capacity Empty Weight No. Of Trips Per/Day <br />18-Wheelers Tons Tons <br />10-Wheelers Tons Tons <br />4-Wheelers 4.5 Torts 16.5 Tons 44 <br />Tons Tons <br />Revised July 2010 ?a 6-.16) <br />hn://www.cdphe.state.co.us/ap'tiosi,onM.htmI