Laserfiche WebLink
EXHIBIT K <br />JUBILEE VENTURE LLC <br />EAGLE MINE PROJECT <br />CLIMATE <br />The Eagle Mine Project will be a seasonal operation due to the climate at Sec. 2, T. 10 N, R 92 <br />W, 6th PM. Although there may be some variation in operating schedules because of early <br />springs or late falls or winters, it is likely that operations will be restricted to May through <br />October of any operating year (essentially 180 days). There is climate information from RAWS <br />(remotely accessed weather station) at Great Divide, a former mining town which is now a <br />housing development about 7 to 8 miles west and south of the Eagle Mine site. This <br />information was compiled on a daily basis and was available on a NOAA website. However, the <br />last check with the website showed the information had been curtailed. It is not know if it will <br />be once again activated. <br />The major information to be derived from this source was evaporation rates. Such rates are <br />available from data published by the National Weather Service and were incorporated into the <br />water management plan attached to the Water Well Application as incorporated in Schedule G. <br />Ta (.- )