Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 005 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />GREELEY, CO <br />10.00 miles <br />35.00 mph <br />$4,758.09 <br />$118.25 <br />Non-Roadable <br />Equipment Roadable <br /> <br />Equipment <br />0.29 0.29 <br />0.29 0.29 <br />0.50 NA <br />0.50 NA <br />1.57 0.57 <br />Total job time: 3.14 Hours <br />Total job cost: $4,876.34 <br />CIRCES Cost Estimating Software