Bulldozer Worksheet Cont'd Task # 004 Page 2 of 2 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (GEN. <br />1.000 AVG. <br />0.830 (1 SHIFT/DAY) <br />1.000 (DOZ-OC) <br />1.000 (CAT HB) <br />1.000 (CAT HB) <br />0.568 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.3536 <br />Adjusted unit production: <br />Adjusted fleet production: <br />301.48 LCY/hr <br />602.96 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.575/LCY <br />Total job time: 210.63 Hours <br />Total job cost: $73,081.40 <br />CIRCES Cost Estimating Software