Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 003 Page 2 of 2 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile. <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (GEN.) <br />1.000 AVG. <br />0.830 (1 SHIFT/DAY) <br />0.700 (FND-MF) <br />1.000 (CAT HB) <br />1.000 (CAT HB) <br />1.438 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.6266 <br />Adjusted unit production: 534.24 LCY/hr <br />Adjusted fleet production: 534.24 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.308/LCY <br />Total job time: 43.99 Hours <br />Total job cost: $7,243.38 <br />CIRCES Cost Estimating Software