Laserfiche WebLink
Mr. Jared Dains May 17, 2011 <br />Middle Poudre Combined Plan - Lafarge West, Inc. Page 8 of 9 <br />accounting form provided with your application is subject to modification and approval by the <br />division engineer. All amounts shall be in acre-feet. <br />13. Based on the Division 1 Water Court decision in case no. 2009CW49, the replacement of <br />evaporative depletions is not required for ground water exposed to the atmosphere prior to <br />January 1, 1981 through open mining of sand and gravel, regardless of whether open mining <br />operations continued or were reactivated on or after that date. The Water Court effectively held <br />that Senate Bill 120 of 1989, as amended in Senate Bill 93-260, exempted all pre-1981 exposed <br />ground water regardless of whether open mining operations continued or were reactivated on or <br />after January 1, 1981. The areas exposed prior to 1981 at the East Rigden Pit and the <br />Weitzel Pit is shown on the attached maps. The exemption from augmentation <br />requirements for the pre-1981 area is tied to the physical location identified on the map for <br />each site and may no longer be re-allocated to other areas of ground water exposure <br />within the gravel pits permit boundaries. <br />14. The amount and location of the dry-up of the irrigated acreage associated with the applicant's 8.5 <br />shares of the Box Elder Ditch was documented and approved by the division engineer and water <br />commissioner. To assure that depletions from ground water evaporation do not occur in the <br />unforeseen event, or events, that would lead to the abandonment of the pits included in this <br />SWSP, according to an affidavit dated November 22, 2010, the Applicant dedicated the 8.5 <br />shares of the Box Elder Ditch as replacement water solely to this SWSP for as long as there are <br />depletions at these gravel pit sites or until such time as another replacement source is obtained. <br />For the purposes of this SWSP, this affidavit will be accepted for the dedication of the <br />shares; however, if the.State Engineer determines that a different affidavit or dedication <br />process is necessary to assure proper dedication of the shares, additional information may <br />be required prior to future SWSP approvals. <br />15. This substitute water supply plan may be revoked or modified at any time should it be determined <br />that injury to other vested water rights has or will occur as a result of this plan. Should this supply <br />plan expire without renewal or be revoked prior to adjudication of a permanent plan for <br />augmentation, all use of ground water must cease immediately. <br />16. Lafarge, West, Inc. filed for a plan for augmentation for the Port of Entry Pit site in case no. <br />2004CW111 and filed for a plan for augmentation for the Weitzel Pit site in case no. 2002CW205. <br />Lafarge is required to operate the Port of Entry Pit site and the Weitzel Pit site under an SWSP <br />until such time as a decree is entered in case'nos. 2004CW111 and 2002CW205. If reclamation <br />of the mines at the Three Bells Pit and Kyger Pit sites produces a permanent water surface <br />exposing groundwater to evaporation, an application for a plan for augmentation must be filed with <br />the Division 1 Water Court at least three years prior to the completion of mining to include, but not <br />be limited to, long-term evaporation losses. If a lined pond results after reclamation, replacement <br />of lagged depletions shall continue until there is no longer an effect on stream flow. Granting of <br />this plan does not imply a position by our office on any litigation associated with case nos. <br />2004CW111 or 2002CW205, or any other case. <br />17. Dewatering at the Three Bells Pit and Shield Mine will produce delayed depletions to the stream <br />system. As long as the pits are continuously dewatered, the water returned to the stream system <br />should be adequate to offset the depletions. However, once dewatering at the sites cease, the <br />delayed depletions must be addressed. A plan that specifies how the post pumping dewatering <br />depletions (including refilling of the pit) will be replaced, in time, place and amount along with the