Laserfiche WebLink
<br />i <br />PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Dennis Jones <br />NPDES I.D. NO.: CO-0000221 D.P. 008 <br />FACILITY CONFIGURATION: Cross-Valley Pond <br />SITE NAME: Pond #008 <br />MINE NAME: Seneca II Mine (Seneca Coal Cc) <br />MINE I.D. NO.: CMLRD Permit No. C-80-005 <br />DATE : 3 -;j3 -11 <br />DATE LAST INSPECTION: D -1-I" <br />10- <br />LOCATION: SWl/a NWl/,, Sec. 7, TSN, R86W <br />LOCATION: 7.1 mi. SE of Hayden, CO <br />OWNER'S REP.: Roy Karo, Gen Mgr <br />Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes <br />2. Lift thickness: 12 <br />3. Compaction according to approved plan: Yes <br />4. Burning (specify extent and location): No <br />5. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: N/A <br /> At isolated points on embankment slopes: Yes No N/A <br /> At natural hillside: Yes No N/A <br /> Over widespread areas: Yes No N/A <br /> From downstream foundation area: Yes No N/A <br /> "Boils" beneath stream or ponded water: Yes No N/A <br />7. Cracks or scarps on crest: Yes No N/A <br />8. Cracks or scarps on slope: Yes No N/A <br />9. Sloughing or bulging on slope: Yes No N/A <br />10. *Major erosion problems: K6 ® W N/A <br />11. Surface movements in valley bottom or on hillside:p Ye N/A <br />12. *Erosion of toe: Yes No N/A <br />13. *Water impounded against toe: Yes N N/A <br />14. Existing embankment freeboard: (normal = 4.71) ??•? feet <br />15. Increase Decrease in water level: KO G cL.N <br />k feet <br />16. VV! <br />Cracks, bulging, or erosion on upstream face: Yes No N/A <br />17. Visible sumps or sinkholes in slurry surface: N/A <br />18. *Clogging <br /> Spillway channels and pipes: Yes 0 N/A <br /> Decant system: N/A <br /> Diversion ditches: N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes No N/A <br /> Decant system: N/A <br />20. Trash racks clear and in place: e® No N/A <br />21. Discharge rate (gpm) o? <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />hark of 1-hi c c}IPPY <br />