Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Dennis Jones <br />NPDES I.D. NO.: CO-0000221 D.P. 011 <br />FACILITY CONFIGURATION: <br />SITE NAME: Pond #011 <br />MINE NAME: Yoast Mine(Seneca Coal Cc) <br />MINE I.D. NO.: CMLRD Permit No. C-94-082 <br />DATE : 3 ' o I <br />DATE LAST INSPECTION: O"ZO' 10 <br />LOCATION: NEY4 SWY4,Sec. 16, TSN, R87W <br />LOCATION: 8.5 mi. SE of Hayden, CO <br />OWNER'S REP.: Roy Karo, Gen Mgr <br />Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes <br />2. Lift thickness: 8 in. <br />3. Compaction according to approved plan: Yes <br />4. Burning (specify extent and location): No <br />5. Angle of slope: 3.0:1 upstream, 2.8:1 downstream Total = 5.8:1 <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: Yes N/A <br /> At isolated points on embankment slopes: Yes N/A <br /> At natural hillside: Yes N/A <br /> Over widespread areas: Yes N/A <br /> From downstream foundation area: Yes N/A <br /> "Boils" beneath stream or ponded water: Yes N/A <br />7. Cracks or scarps on crest: Yes i N/A <br />8. Cracks or scarps on slope: Yes N/A <br />9. Sloughing or bulging on slope: Yes N/A <br />10. *Major erosion problems: Yes N/A <br />il. Surface movements in valley bottom or on hillside: Yes N/A <br />12. *Erosion of toe: Yes N/A <br />13. *Water impounded against toe: Yes N N/A <br />14. Existing embankment freeboard: (normal = 5.11) feet <br />15. Increase Decrease in water level: yto c Lze feet <br />16. Cracks, bulging, or erosion on upstream face: Yes ( <br />-23 N/A <br />17. Visible sumps or sinkholes in slurry surface: , <br />N/A <br />18. *Clogging <br /> Spillway channels and pipes: Yes N/A <br /> Decant system: N/A <br /> Diversion ditches: N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes N/A <br /> Decant system: N/A <br />20. Trash racks clear and in place: ® No N/A <br />21. Discharge rate (gpm) U <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />-? ULO Lo <br />Cross-Valley Pond