My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-17_REVISION - C1981033 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2011-05-17_REVISION - C1981033 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:36 PM
Creation date
5/18/2011 12:45:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
5/17/2011
Doc Name
Final Letter
From
DRMS
To
Bear Coal Company
Type & Sequence
SL4
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />United States Department of the Interior <br />0 <br />OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />q age Western Region Office <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202-3050 <br />April 22, 2011 <br />David Berry <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80202 <br />OF& <br />RECEIVED <br />APR 2 a 2011 <br />Division UT Reclarnahon, <br />Mining and Safei <br />RE: Partial Phase I Bond Release (SL4), Bear No. 3 Mine <br />Permit No. C-1981-033, DBMS Proposed Decision and Findings of Compliance <br />Dear Mr. Berry, <br />This letter acknowledges the Office of Surface Mining (OSM), Denver Field Division's (DFD) <br />receipt and review of the above Partial Phase I Bond Release Proposed Decision document <br />prepared by the Division of Reclamation, Mining and Safety (DRMS) dated March 31, 2011. <br />DFD agrees with the findings and decision document and hereby provides OSM concurrence for <br />the above bond release action in accordance with 30 CFR 740.15 (d) (3), and 30 CFR 906.30, <br />Article IX, Section 24, of the State-Federal Cooperative Agreement. <br />DRMS's Proposed Decision documents the applicant's compliance with the Colorado approved <br />regulatory program at Rule 3.03.2, and DRMS's bond release guidelines dated April, 18, 1995. <br />This Partial Phase I bond release applies to structural removal and backfilling and grading over <br />7.5 acres of the total disturbed area of 9.0 acres and drainage control according to the approved <br />reclamation plan. A post mining land uses of "undeveloped land and limited residential use" are <br />the same as the pre mining land uses for this area. <br />OSM finds that the Bear Coal Company (BCC) has met or exceeded the requirements for Phase I <br />bond release on the 7.5 acres of land as described above. DRMS currently holds three _ Y --~ <br />reclamation bonds (a cash bond and two Certificates of Deposit) in the amount of $279,224.00. <br />Of this amount, BCC is requesting a release of up to $167,000.00. This action will release <br />$148,833.00, which is less than the maximum sixty percent of the applicable bond liability, or <br />$167,534.40. The reason for this difference is that BCC has not requested a Phase I bond release <br />for the entire site, and DRMS calculated that the reclamation tasks that remain would cost <br />$130,391.00 fbr a third parry to complete. OSivi concurs with the proposed bond release aalo it.
The URL can be used to link to this page
Your browser does not support the video tag.