My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-01_PERMIT FILE - M2010071 (9)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010071
>
2011-04-01_PERMIT FILE - M2010071 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:14 PM
Creation date
5/17/2011 1:27:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
PERMIT FILE
Doc Date
4/1/2011
Doc Name
Ground Water Monitoring and Mitigation Plan.
From
McLaughlin Water Engineers
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />March 28, 2011 <br />McLaughlin Water Engineers, Ltd. <br />2420 Alcott Street <br />Denver, Colorado 80211 <br />Attention: Mr. Aaron K. Asquith, PE <br />Principal <br />CTLITHOMPSON <br />Subject: Ground Water Monitoring Plan <br />Goose Haven Reservoir Complex Expansion <br />Goose Haven Reservoir No. 2 <br />Lafayette, Colorado <br />CTL T Project No. FC04797.004 -145 L1 <br />• McLaughlin Water Engineers: <br />The State of Colorado, Division of Reclamation, Mining and Safety in their <br />letter to McLaughlin Water Engineers, Ltd. dated March 9, 2011 concurred with the <br />findings in our Ground Water Response Study letter dated February 28, 2011 for <br />the Goose Haven Reservoir Complex Expansion. In their March 9 letter the <br />Division requested the "Applicant" submit a "groundwater monitoring plan." The <br />Division writes a part of this plan "should include the location of monitoring <br />stations" in addition to several other elements. <br />In June 2009 (CTL I Thompson letter dated June 9, 2009, CTL I T Project <br />No.: FC04797.000-145 L1) we installed seven (7) piezometers at locations agreed <br />upon by the City of Lafayette, McLaughlin Water Engineers, Ltd. and CTL I <br />Thompson, Inc. As requested, we have gathered the information from our files <br />and reports for the project regarding the seven-piezometer network. Attached are; <br />• Figure 1 - An areal photograph of the reservoir complex showing <br />the piezometer locations; <br />• Figure 2 - A map showing the piezometer locations relative to the <br />existing and proposed reservoir along with the locations of other <br />borings drilled at the complex and our interpretation of the bedrock <br />contours; <br />• Figure 3 - A schematic drawing showing the details of the installed <br />piezometers; <br />• • Figure 4 - The summary logs of the borings in which the <br />piezometers were installed, and <br />• Figure 5 - The legend and notes for the summary logs. <br />351 Linden Street Suite 140 Fort Collins, Colorado 80524 <br />Telephone: 970-206-9455 Fax: 970-206-9441
The URL can be used to link to this page
Your browser does not support the video tag.