My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-01_PERMIT FILE - M2010071 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010071
>
2011-04-01_PERMIT FILE - M2010071 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:14 PM
Creation date
5/17/2011 1:27:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
PERMIT FILE
Doc Date
4/1/2011
Doc Name
Explanation of Attachments- Part 1- to Proof of Pub.
From
McLaughlin Water Engineers
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laughlin Water <br />E N G I N E E R S L T O. <br />• <br />• <br />March 30, 2011 <br />Mr. Michael Cunningham <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 21.5 <br />Denver, CO 80203 <br />RE Goose Haven Reservoir #2; DRMS File No M-2010-071, <br />Explanation of Attachments <br />Mr. Cunningham, <br />140)SS PUS Buiuryy <br />luolxeurpln?v go UOISI CI <br />ItOZ 1 0 ddd <br />®3AIa;J3S <br />We have received the Division's Preliminary Adequacy Review, Slope Stability Analysis <br />Review for Goose Have No. 2, Permit No. M-2010-071 and Goose Haven #2; DRMS File No. <br />M-2010-071; Adequacy Review - 02 related to section 6.4.7 Exhibit G - Water Information. <br />Attached we have provided responses to the three aforementioned reviews. In addition, we have <br />included proof of publication in the Daily Camera as well as proof of notification to adjacent <br />landowners. <br />The attached binder includes a full set of all responses including calculations from the slope <br />stability analysis completed for the project. The loose leaf set includes all information with the <br />exception of the calculations from the slope stability analysis. A summary of the attached <br />information is as follows: <br />1. Response to Preliminary Adequacy Review <br />2. Proof of Publication <br />3. Proof of Notice to Adjacent Landowners <br />4. Ground Water Monitoring Plan (response to Adequacy Review No. 2 pertaining to Water <br />Information) <br />5. Ground Water Response Study by CTL Thompson (response to Slope Stability Analysis <br />Review) <br />E <br />Please review the attached documents and please feel free to call or email with any questions or <br />for additional information. <br />Sincerely, <br />Aaron K. Asquith, w <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.