My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-12_PERMIT FILE - P2011010 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011010
>
2011-05-12_PERMIT FILE - P2011010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:28 PM
Creation date
5/16/2011 3:10:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011010
IBM Index Class Name
PERMIT FILE
Doc Date
5/12/2011
Doc Name
New NOI application (public file)
From
Rio Grande Silver, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Remove -250 cubic yards of rock talus fill from the Equity portal entrance and place the fill <br />adjacent to and north of the portal entrance in a 100' x 100' area against the toe of the slope. <br />Remove -30 cubic yards o roc talus from the vent a i entrance an place the i a Facen o <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity Average Width (ft) Average Length (ft) <br />B. Drill Holes: Quantity Depth (ft) Diameter (in) <br />C. Mud Pits: Quantity Average Width (ft) Average Length (ft) <br />Average Depth (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />See attached page 6-2.2 Project Scope <br />F. Other Disturbances (please describe): <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />No Chemicals Diesel fuel will b hauled to equipment daily in 100 gallon or less fuel tanks <br />in work trucks. <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />No new roads or culverts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.