Laserfiche WebLink
SURFACE ELEVATION 7951' <br />Hole plugged and <br />abandoned 7 /17/2002 <br />CEMENT GROUT <br />10 3/4' STEEL CASING <br />J -55 40.5 # /FT <br />ID: 10.050'1 COUPLER OD: 11.75 <br />TOP OF 7 5/8' STEEL CASING <br />J -55 26 # /FT <br />ID, 6.969'1 COUPLER OD 8.50' <br />Y —/4' SLOTTED CASING <br />BOTTOM 15' HOLE <br />DRILLED TO 1342.33' <br />tfw <br />XX «,r X x <br />XX = *^ X x 19' SURFACE HOLE WITH <br />•i -• 18.80' OF 16' O.D. CASING <br />x X <br />x x X X <br />X X X X <br />x Lansas 10' Packer <br />x x Set at 1010' <br />x x <br />X x <br />X x <br />X x <br />X <br />X FRACTURE WITH UP TO 100 GPM <br />GROUNDWATER 840' - 875' <br />X X <br />x X <br />X x <br />X x <br />X x <br />X <br />x x <br />x x <br />x X <br />x X <br />i <br />X <br />x x <br />BOTTOM OF 7 5/8' CASING II <br />AT 1580.36 \ <br />TOP 7 5/8' OF CASING AT 1303.70' <br />EXTENDING 31.89' INTO THE 10 3/4' CASING <br />BOTTOM [IF 10 3/4' <br />CASING AT 1340' <br />BASE 9 HOLE DRILLED TO <br />DRILL DEPTH OF 1582' <br />'B' SEAM <br />�JfOUKTAIN COAL SST ELK �+�. <br />`— P.O. 60X 391, 3174 NWY. <br />1 COMPANY, ur: sara+scr, CO- at, <br />GVB 14 — 08 COMPLETION <br />• •L •• T 1o/ta/0 <br />TLY N75 <br />a ®w a,;5�2002 l ow 14-oe m � <br />