Laserfiche WebLink
Table No. 5 <br />Lafarge West, Inc. <br />Upper Poudre River Combined SWSP <br />Projected 2011 Water Balance <br />Loss [%/mil = 0.25% <br />Mileage [mil = 10 Loss [%] = 7.8% <br />Prepared By., Applegate Group, Inc. <br />Date Revised: 513/2011 <br />AG Job #: 09-100 <br /> <br />WY 2010 _011 Initial Leases - <br /> FHD = 171.04 ac-ft Gra elcy . Tri-Districts PRPA LCRC <br /> F ..... 11 <br /> <br /> <br /> <br />t- <br />, <br /> <br /> <br /> <br />e, F <br /> <br /> <br />i <br /> <br /> <br />n <br /> <br /> <br /> <br /> <br />F <br /> <br /> <br /> <br /> <br /> <br />F <br /> <br /> <br /> <br />. <br /> <br /> <br /> <br /> <br /> <br />tF: <br /> <br /> <br />N <br /> <br /> <br /> <br /> <br /> <br />.-L <br />DI I <br /> <br /> <br />r <br /> <br />= <br /> <br /> <br /> <br />- LCRC <br /> <br /> <br /> <br />ugmentation <br />Iise CU <br /> <br />?n only) <br /> <br />re-feet) <br /> <br />Final Monthly <br /> <br /> <br />Excess (+) or <br /> <br /> <br />Deficit (-) <br />(acre-feet) <br /> <br />Nov-10 <br />0.00 <br />0 <br />75% <br />13 <br />04 <br />1 <br />28 N) C) <br /> . . . 13.88 -2.12 <br />2.40 <br />0 <br />28 <br />Dec-10 0.00 0.51% 9.88 0.88 3.26 5.75 . <br />5 <br />75 <br />Jan-11 0.00 0 <br />41% 8 <br />01 0 <br />70 . <br /> . . . 1.51 5.80 5 <br />80 <br />Feb-11 0.00 0 <br />34% 6 <br />60 0 <br />58 . <br /> . . . 0.99 5.03 5 <br />03 <br />Mar-11 0.00 0 <br />28% 5 <br />45 0 <br />48 . <br /> . . . 13.29 -8.32 8.70 0 <br />38 <br />Apr-11 30.94 53.72% 10.28 16.62 22.61 0.29 -29.23 29.80 . <br />0 <br />57 <br />May-11 25.78 62 <br />90% 16 <br />91 16 <br />22 . <br /> . . . 30.29 0.38 -29.98 35.90 2.80 312 <br />Jun-11 60.79 37.92% 25.04 23.05 47.91 0.46 -46.38 20.55 0.51 33.90 2.64 4.92 <br />Jul-11 50.73 40.70% 33.91 20.65 55.18 0.48 -42.39 45.82 1.15 2.60 4.88 <br />Aug-11 30.88 42.92% 32.64 13.25 51.77 0.43 -32.81 36.80 3.99 <br />Sep-11 30.47 47.22% 29.59 14.39 38.89 0.32 -24.00 27.00 3.00 <br />Oct-11 10.73 0.04% 25.52 0.11 27.44 0.22 -2.25 310 0.85 <br />Nov-11 0.00 0.75% 18.29 1.80 17.42 -0.92 1.30 0.38 <br />Dec-11 0.00 0.51% 13.25 1.23 4.95 7.06 7.06 <br />Total 240.31 - 248.42 104.17 7.05 324.39 2.57 -194.76 66.37 69.80 5.44 42.20 69.50 46.01 <br />(A) Projected diversions into recharge <br />(B) Taken from Table No. 3 Column (1) <br />(C) Taken from Appendix D <br />(D) Summer months: Column (A)' Column (B) <br />(E) Winter months: Column (B) • Column (C) total for previous irrigation season <br />(F) Taken from from Table 1 Column (H) <br />(G) Assuming 1.0 acre pond at gross evaporation rate <br />(H) Column (C) - Column (D) - Column (E) - Column (F) - Column (G) <br />(1) City of Greeley augmentation water lease schedule; provided to augment evaporation from Treiber Lakes <br />(J) Transit loss on City of Greeley releases estimated at 0.25% per mile for 10 miles <br />(K) Tri-Districts augmentation water lease schedule; provided to augment evaporation from Treiber Lakes <br />(L) Transit loss on Tri-Districts releases estimated at 7.8% <br />(M) Platte River Power Authority augmentation lease schedule. Transit losses not required <br />(N) Lake Canal Reservoir Company augmentation lease schedule. Transit losses not required <br />(0) = Column (H) + Column (1) - Column (J) + Column (K) - Column (L) + Column (M) + Column (N)