My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-12_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-05-12_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:19 PM
Creation date
5/16/2011 12:57:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
5/12/2011
Doc Name
Amendment Approval
From
DRMS
To
Ray Lazuk- Climax Mine
Type & Sequence
AM6
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM-06 Stipulations <br />5-10-11 <br />Reservoir. Depending upon the adequacy of information on geological and groundwater <br />conditions and field observations, it may be possible to establish monitoring points at <br />existing springs, or surface water seeps. <br />(b) The surface and groundwater monitoring for potential 1 Dam seepage <br />between the north abutment of I Dam and Eagle Park Reservoir will be included in the <br />Water Monitoring Plan, which will specify the frequency of sample collection, field and <br />laboratory analysis parameters, and criteria for identifying changes and conditions that <br />could adversely impact water quality in Eagle Park Reservoir. <br />(c) The Water Monitoring Plan will include surface water sampling <br />location(s) in the drainage basin above Clinton Reservoir. The Water Monitoring Plan <br />will specify the frequency of sample collection, field and laboratory analysis parameters, <br />and criteria for identifying changes and conditions that could adversely impact water <br />quality in Clinton Reservoir. <br />(d) The Water Monitoring Plan will include a sampling location in the East <br />Interceptor downstream of the McNulty OSF and upstream of Clinton Reservoir. The <br />Water Monitoring Plan will specify the frequency of sample collection, field and <br />laboratory analysis parameters, and criteria for identifying changes and conditions that <br />could adversely impact water quality in Clinton Reservoir. <br />2. Content of the Environmental Protection Plan <br />Regarding content of the revised EPP to be submitted for review and approval in a <br />separate future proceeding, the EPP will address at a minimum: <br />(a) Clinton Gulch watershed: <br />i. Climax will utilize Best Management Practices (BMPs) for <br />blasting activities to prevent water quality impacts from flyrock entering the Clinton <br />Gulch watershed. <br />ii. The Bartlett Mountain Road will be designed to direct runoff from <br />the road and associated fill slopes toward the McNulty Gulch and the Open Pit. <br />iii. Stormwater Management Plan BMPs will be implemented to <br />prevent water quality impacts to the Clinton Gulch watershed from erosion and sediment <br />that may be associated with road construction and pit development activities near the <br />summit of Bartlett Mountain. <br />iv. Collection facilities will be installed to prevent impacted drainage <br />from the McNulty OSF from entering the East Interceptor Ditch. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.