My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-13_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2011-05-13_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:31 PM
Creation date
5/16/2011 8:29:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
5/13/2011
Doc Name
April 2011 monthly report
From
Battle Mountain Resources, nc.
To
DRMS
Email Name
ACS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />May 09, 2011 <br />Mr. Allen Sorensen <br />State of Colorado <br />-? b Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-J J 2 <br />April 2011 Monthly Report ,/ <br />Dear Mr. Sorensen: <br />RECEV,D <br />MAY f? 3..201 ? <br />pivision ofaSate <br />W10119 IMP <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of April, 2011. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR-32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on April 28th, no water was present for sampling and <br />subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on April 28th. April tailings impoundment piezometer measurements identified these <br />installations were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables 1 <br />and 2 below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The leak detection system was measured on April 28th. A total of 790 gallons of water was excavated <br />from the leak detection system yielding a monthly average of 28.21 gpad. The tailings pond under-drain <br />measured 28 gpm. <br />During April the West Pit water treatment plant operated efficiently discharging a total of 2,271,008 <br />gallons (6.97 acre-feet) of water to Rito Seco Creek and a total of 6,553,300 gallons (20.11 acre-feet) of <br />water was transferred from the water treatment plant to the tailings impoundment. Seepage along Rito <br />Seco Creek remained dry during the month. <br />P.O. Box 310 - San Luis, Colorado 81152-0310 - (719) 379-0798 - Fax (719) 379-0713
The URL can be used to link to this page
Your browser does not support the video tag.