Laserfiche WebLink
UA - Onshore Gas Number: CO-HSE-032 <br /> <br />10 HSE Procedure Custodian: Colorado Operations <br /> Spill Prevention, Control and Revision: 0 <br />, Countermeasure (SPCC) Plan Effective: January 2012 <br />PROFESSIONAL ENGINEER CERTIFICATION <br />Professional Engineer (PE) Certification: <br />By means of this PE Certification, I hereby attest to the following: <br />• I am familiar with the requirements of 40 CFR Part 112 and have verified that this Plan <br />has been prepared in accordance with the requirements of this Part. <br />• I have verified that this Plan has been prepared in accordance with good engineering <br />practice, including consideration of applicable industry standards. <br />• I have verified that the required inspection and testing procedures have been established <br />as described herein. <br />• I have verified that the Plan is adequate for the Facility. <br />Op <br />4 <br />a 4'-7 1 t` - <br />ao ?? o <br />Printed: April 7, 2011 Professional Engineer Certification Page 9 of 71 <br />The controlled version of this "controlling document" resides online in Livelink®. Printed copies are UNCONTROLLED.