My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-11_HYDROLOGY - M2001085
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2011-05-11_HYDROLOGY - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:26 PM
Creation date
5/12/2011 11:55:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
HYDROLOGY
Doc Date
5/11/2011
Doc Name
Substitute Water Supply Plan
From
OSE
To
Martin and Wood Water Consultants, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED TABLE 3: ASSUMES LINER INSTALLED BY JUNE 30, 2011 <br />GSL SAND AND GRAVEL MINE <br />REPLACEMENT SCHEDULE ASSUMING LINER IS INSTALLED BY JUNE 30, 2011 <br />(DEPLETIONS AND DELIVERIES ARE CONSIDERED POSITIVE IN THIS TABLE) <br />!11 191 1 1 <br /> <br />. <br /> <br />YEAR <br />MONTH <br />TOTAL GROUND WATER <br />EVAPORATION <br />AND <br />OPERATIONAL <br />WATER LOSSES <br />(ACRE-FEET) <br /> <br />UNLAGGED <br />CREDIT <br />FOR WATER PLACED IN <br />HENDERSON WATER SKI LAKE <br />(ACRE-FEET) - <br /> <br /> <br />CREDIT FOR WATER <br />PLACED IN SOUTH PLATTE <br />RIVER (INSTANTANEOUS) <br />(ACRE-FEET) <br />NET EFFECT TO RIVER <br />(INCLUDES DEPLETIONS FROM <br />DEWATERING AND LAGGED <br />ACRETIONS FROM CREDITS TO S.P <br />AND WATER SKI LAKE) <br />(ACRE-FEET) r? <br /> <br /> <br /> <br />RIGHTON DELIVERY <br />DELIVERY SCHEDULE <br />(ACRE-FEET) <br />NOV 27.06 -13.45 -13.45 1.09 0.68 <br />DEC 27.1 -13.45 -13.45 1.18 0.74 <br />2010 TOTAL 54.16 -26.9 -26.9 2.27 1.42 <br /> <br />JAN 27.79 -13.45 -13.45 1.24 1.24 <br />FEB 27.81 -13.45 -13.45 1.28 1.28 <br />MAR 27.84 -13.45 -13.45 1.30 1.30 <br />APR 27.95 -13.45 -13.45 1.32 1.32 <br />MAY 28.02 -13.45 -13.45 1.35 1.35 <br />JUN 28.15 -13.45 -13.45 1.38 1.38 <br />JUL 0 0.00 0.00 14.81 14.81 <br />AUG 0 0.00 0.00 12.63 12.63 <br />SEP 0 0.00 0.00 10.03 10.03 <br />OCT 0 0.00 0.00 7.74 7.74 <br />Jan 2011 through October 2011 167.56 -80.7 -80.7 53.08 53.08 <br />NOV* 0 0.00 0.00 5.83 5.83 <br />DEC' 0 0.00 0.00 4.29 4.29 <br />2011 TOTAL 167.56 -80.7 -80.7 63.2 63.2 <br />NOTES: <br />(1): FROM TABLE 2 <br />(2): FOR WATER PLACED IN HENDERSON WATER SKI LAKE <br />(3): INSTANTANEOUS ACCRETION TO RIVER FOR WATER PLACED IN PIPELINE TO RIVER <br />(4): COL (1) + LAGGED COL 2 + COL 3 <br />(5): DELIVERY SCHEDULE FROM BRIGHTON <br />NOTE: TOTAL DELIVERIES EXCEED THE OPERATIONAL LOSSES SHOWN IN COLUMN 1 BECAUSE THE DELIVERY SCHEDULE INCLUDES OPERATIONAL LOSSES BACK TO 2008 <br />VALUES FOR NOVEMBER AND DECEMBER 2011 ARE INCLUDED IN THIS TABLE BUT NOT COVERED UNDER THIS SWSP RENEWAL
The URL can be used to link to this page
Your browser does not support the video tag.