Laserfiche WebLink
Tab 14 <br />List of Appendices <br />14 -1 <br />RECLAMATION PLAN <br />Rule <br />Description Page <br />2.05.4(2) <br />Reclamation Plan .............. ............................... 14 -1 <br />14 -3 <br />List of Tables <br />14 -1 <br />Reclamation Soils Balances & Areas <br />14 -2 <br />Stockpile Volumes & Redistribution <br />14 -3 <br />Temporary Seed Mixture <br />14 -4 <br />Permanent Seed Mixture <br />14 -5 <br />1999 Vegetation Sampling <br />14 -6 <br />Permanent Seed Mix for 2 West Portals and South Fan <br />14 -7 <br />RDRDA Borrow Area - Quantity Calculation <br />14 -8 <br />Permanent Seed Mixture - Lowland and Upland Components <br />14 -9 <br />Permanent Seed Mixture - North Decline, Fall 1992 (Historical) <br />14 -10 <br />Permanent Seed Mixture - CRDA 2 & 3 (Historical) <br />14 -11 <br />Permanent Seed Mixture - Ute Water Disturbance, 2000 (Historical) <br />14 -12 <br />Interseeding Seed Mixture - CRDA 2, November 2001 (Historical) <br />14 -13 <br />Permanent Seed Mixture - (Historical) <br />14 -14 <br />North Decline Interseeding <br />14 -15 <br />Salt Tolerant Seed Mix <br />List of Appendices <br />14 -1 <br />List of Figures <br />14 -1 <br />Reclamation Timetable <br />14 -2 <br />Permanent Mine Seal <br />14 -3 <br />Permanent Drill Hole Seal <br />14 -4 <br />Refuse Pile Animal Habitat <br />14 -5 <br />RSDA South End Rirrap Ditch <br />14 -6 <br />Roadside South Portal Mine Water Discharge System <br />14 -7 <br />Roadside South Portal Dewatering Schematic <br />14 -8 <br />Mine Dewatering - Plan and Profile <br />14 -9 <br />Roadside South Portal - Mine Inflow Rate Determination <br />14 -10 <br />North Decline Mine Discharge System - Flow Calculation <br />14 -11 <br />Siphon System - Flow Calculation without Siphon Influence <br />14 -12 <br />Debris Fin <br />14 -13 <br />Cameo Borrow Area No. 1 <br />14 -14 <br />Portal Highwall <br />List of Appendices <br />14 -1 <br />BLM- Proposal for Revegetation Research Project <br />14 -2 <br />Reclamation Plan Cost Estimate <br />14 -3 <br />Reclamation Costs, Cameo Refuse Disposal Areas No. 2 and other Areas <br />14 -4 <br />Other Reclamation Cost Estimates <br />14 -5 <br />Affected Land Owners Reclamation Approval <br />14 -6 <br />Final Reclamation Drainage Design <br />14 -7 <br />Revegetation Evaluation - Diversity <br />14 -8 <br />Slope Stability Analysis - Roadside South Portal <br />14 -9 <br />Approximate Original Contour Variance <br />14 -10 <br />Steep Rock Slope Retention <br />14 -11 <br />Re- Evaluation of Revegetation Success Standards - 2010 <br />List of Exhibits <br />RS -11 -008 <br />Roadside Mine Revegetation Field Trials of Refuse Pile <br />6C <br />Roadside Mine -Post Mining Topography <br />6C -A <br />Active Area/Alternative Land Use <br />TR -60 (Rev 01/11) <br />