My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-29_PERMIT FILE - M2011001 (21)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011001
>
2011-04-29_PERMIT FILE - M2011001 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:00 PM
Creation date
5/9/2011 11:44:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011001
IBM Index Class Name
PERMIT FILE
Doc Date
4/29/2011
Doc Name
Adequacy Review Response thru Att. 5.
From
Tetra Tech
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-.vr nc-WWk u <br />Other Conditigns <br />rax-JUJ(6zuoju Jan 10 2011 11:33 P.03 <br />Permit Number COG-5ooooo <br />Pact*Numbcr COG-501527 <br />Page la' <br />C icals <br />The permittee did not specify any chemicals for use in waters that may be discharged On this basis, no chemicals are approved under <br />this Pmuit- Prior to use of any applicable chemical, the permittee must submit a request•for approval which includes the most current <br />Material Safety Data Sheet (MSDS) for that chemical. Until approved, use ofa chemical in waten'thatmay be discharged could <br />result in discharge of pollutant not authorized under the permit <br />,Orttide?radah,,,?y ' <br />Antideeradation review does not apply to this permit because the receiving stream is designated as Use Protected <br />Groundwater C ?tcuninalion <br />If groundwater contami <br />collection nation is encountered, then the permittee is to contact. the Division and, if <br />system receiving the discharge. Since, the dischar ' of con appropriate, the owner of the <br />perrnittee shall immediately apply for a ; Laminated groundwater is not covered under this permit, the <br />groundwater remcdiath <br />additional discharge monitoring-and on-site On certification, which will include appropriate requirements for <br />environmental response capabilities. <br />Som lin , <br />Sampling, shall occur at a point after treatment, or after the implementation of any Best Management are not implemented, sampling shall occur where the discharge leaves control ofthpermatteePractice <br />s (Bops). Ifng tPs or <br />receiving stream. Samples must be representative of what is entering the receiving stream. ' and Prior to catering the <br />Monitorin,2 andRep?rtiyi„g <br />Discharge Monitoring Rapoxts (DMR) must be submitted quarterly as Ions as the cenification is in effect. The <br />provide the Division with any additional monitoring data on tha permitted discharge collected for entities other than the ivision, <br />This will be supplied to the Division within 48 hours of the receipt of the data b the <br />by permittee. <br />This certification to discharge is effective tong terns. For termination of permit coverage the Permittea must initiate this b sen <br />a letter to the Division requesting the.permit certification be tercitinated. by d> <br />$es a -h, p- The permit ee shall implement and maintain Best Management Practices (DW) for the prevention of erosion and the control of solid <br />and liquid pollutants due to the discharge. VMPs include various options, such as: modification of the a discharge structure to <br />disperse flows; containment of water by hay bales or other comparable p <br />for protection of containment structures; n* approved structures; the use of geociotli filter fabriq or plastic sheeting <br />P-rap, and/or any other approved methods. <br />See Part LC. ofrhe <br />permit for stormwater requirements, <br />At the time of applicsaon, the permittee certified that they had developed <br />for this facility. The Permittee shall amend the s and iTnplemEmed a Stormwatei' lulanagement Piaa (SVVMp) <br />which has a.si WMP whe?ncvcr there is a change in design, construction, operation, or maintenance <br />Pffi ant effect on the potential for the discharge of pollutants to the <br />ineffective in achieving the general objectives of controllin er dis a the State, or if the S WI1iIP proves to be <br />copy of the S WMP must be kept on site and provided to the D ?visiontupot req esG ? ai?h?? associated with mining nativity. A <br />The General Permit for Sand and Gravel Miruzg and'A'ocessin <br />The pe General <br />should review this ty g Operations (aud other nonmetallic minerals except fuel) is attached. <br />US certification that cannot be answered by $?rev w? of the a of the permit reguiremeats. If the pezmittee has questions related to <br />hermit, the permit writer should be contacted. <br />Pemlt Writer <br />Maus McGovern <br />303-692_3392 <br />Modified December 15,2010' <br />
The URL can be used to link to this page
Your browser does not support the video tag.