Laserfiche WebLink
charge loads. We would require that this analyses be completed <br />prior to commencing any Mining Activities. <br />d. Periodic tower and foundation inspections following any Mining <br />Activities to evaluate the effects of the Mining Activites on our <br />communications facility. <br />e. A baseline geotechnical study to establish the current condition of <br />the soil within and surrounding the tower compound prior to <br />commencing any Mining Activities. TowerCo further reserves the <br />right to perform additional, periodic geotechnical studies, as <br />TowerCo deems necessary in its sole opinion, throughout the <br />duration and following the completion of the Mining Activies to <br />evalute the impact on the soil conditions within and surrounding the <br />tower compound. <br /> <br />TowerCo will expect Lafarge to cover any and all 'legal and/or engineering costs that <br />TowerCo incurs in satisfying these requirements. <br />Please have your client sign this letter where indicated below as acknowledgement <br />that they agree to the terms and conditions set forth herein. <br />If you have any questions, please call me direct at (919) 653-5708• <br />Regards <br />Steve Caldwell <br />Vice President, Operations <br />AGREED AND ACCEPTED: <br />Lafarge West, Inc. <br />By: _ <br />Name: <br />Title: _ <br />Date: <br />cc: Anne Best Johnson, AICP, Lafarge West, Inc. <br />ido@coweremcom ry towercacam