Laserfiche WebLink
23. Please provide a revised version of Map 1, Surface Ownership showing the <br />TR-56 permit boundary as described by information submitted under Rule <br />2.03, legal description of the permit boundary (question #1 of this letter). <br />NECC Response: Map 1 permit boundary has been added. <br />DRMS Response: Response partially accepted. The Division questions the <br />surface ownership by the DOW for lands north of Highway 12 and east of <br />the RDA as indicated on Map 1. Please check this ownership and <br />correct Map 1 if necessary. <br />24. Please provide Map 2 Coal Ownership at a scale of 1 inch= 1500 feet to <br />match the scale of the Map 1 Surface Ownership. <br />NECC Response: No response to this question was provided. <br />DRMS Response: Please respond to this question. <br />25. The Division must find that the affected area is not within 300 feet of a <br />school or church. Using the materials submitted with TR-56, it is not clear <br />what the exact distance is from the affected area to the church and school <br />shown in Detail VV Map 20, sheet 1. Please provide additional information <br />to show the horizontal distance from the affected area to these two buildings. <br />NECC Response: Figure 19 provides the detail required. <br />DRMS Response: Response accepted assuming Figure label resolution. <br />26. Please correct the text on page 2.05-3b (revised 2114111) to read "days from <br />the first placement of development waste from underground rehabilitation <br />OR the time..." <br />NECC Response: Permit text corrected. <br />DRMS Response: Response accepted. <br />27. Please correct the grammar and punctuation in the last paragraph of page <br />2.05-88 (revised 1/31/11). <br />NECC Response: Paragraph corrected. <br />DRMS Response: Response accepted. <br />28. For all structures to be undermined, limited monitoring of subsidence <br />monuments is required for each of those structures. The proposed plan