Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 274 <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.000 <br />Dozing method: 1.000 <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.900 <br />Push gradient: 0.903 <br />Altitude: 1.000 <br />Material Weight: 0.902 <br />Blade type: 1.000 <br />Net correction: 0.4563 <br />Adjusted unit production: 481.67 LCY/hr <br />Adjusted fleet production: 481.67 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.412/LCY <br />Total job time: 18.68 Hours <br />Total job cost: $3,710.24 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(I SHIFT/DA <br />(SSD-FC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 2 of 2 <br />CIRCES Cost Estimating Software