Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 273 <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 0.900 <br />Dozing method: 1.000 <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.800 <br />Push gradient: 0.903 <br />Altitude: 1.000 <br />Material Weight: 0.793 <br />Blade type: 1.000 <br />Net correction: 0.3209 <br />Adjusted unit production: 224.63 LCY/hr <br />Adjusted fleet production: 224.63 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.884/LCY <br />Total job time: 47.20 Hours <br />Total job cost: $9,371.49 <br />Page 2 of 2 <br />Source <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software