Laserfiche WebLink
<br />Proposed Decision -North Thompson Creek/Phase II Bond Release <br />November 26, 1993 <br />Page 6 <br />C. Sealing of monitoring wells D-1 A and D-2A. <br />D. Covering of the wall on the hill below the hay storage area west of the <br />Roaring Fork River. <br />E. Removal of rubbish from the mine site. <br />F. Reseeding of the Lang Pond embankment and area south of the Long Pond. <br />G. Attainment of the vegetative diversity standard required in the permit. <br />m:\oss\bjw\blp.ntc <br />