Laserfiche WebLink
• • <br /> reclamation of the prime farm land at the truck dump site for which a <br /> $45,000.00 bond is being held. Bond is also required to be held for any <br /> needed repairs to the Siever's ditch that might occur in the future. The <br /> Siever's ditch is below the truck dump area and was reconstructed into a <br /> concrete channel during the original construction phase of the mine. The <br /> managers of the Siever ditch requested that this ditch be replaced back as a <br /> dirt structure. This work was done during the reclamation phase of the <br /> project. However, the mine is committed to repairing the earthen ditch for <br /> five years from the installation and a bond needs to be held for this until <br /> October 1992. A conservative amount of bond of E5,000.00 for five years <br /> d tot 525,000.00. The total of all these reclamation totals <br /> (E�117,920.00 The Division is proposing to hold E321 ,720.00 during this phase <br /> the p ect, therefore more than sufficient bond is present to do all the <br /> re quired at the site. <br /> vj r <br /> 5988E 2t7 = �7� Lu � u�DJv fi 25-Ccv <br /> -6- <br />