Laserfiche WebLink
• Sediment Pond A <br />RIPRAP SIZING - Spillcaay Channel Down Face of Embankment <br />D50 = Size of Riprap <br />D50 = ((V X S".17)/7.58))"2 <br />D50 = Diameter in feet <br />V = Velocity <br />S = Slope <br />D50 = 0.748 feet 8.981 inches <br />The spillway for sediment pond A will be a trapezoidal <br />channel 6.0 feet wide and 0.83 feet deep <br />with a freeboard of 12" for a total depth of 1.830 <br />feet. Riprap, 6" minus, will be placed in the spillway <br />channel across the top of the embankment and riprap, <br />9 inch minus, will be placed in the spillway channel down <br />the face of the embankment and in the inlet channel that <br />feeds the pond. <br />COLLECTION DITCH CDA-1 <br />FLOW IN A TRIANGULAR CHANNEL <br />• ENTER DEPTH D 0.460 FEET <br />ENTER SLOPE S 0.005 EXPRESS AS DECIMAL <br />ENTER "N" N 0.030 EXPRESS AS DECIMAL <br />ENTER SIDE SLOPE X 3.000 SLOPE = X:1 <br />AREA=(W#DI+(X#D"2)= 0.63 FEET"2 <br />WETTED PERIMETER=(WI+2((XD"2+D"2))".5 2.91 FEET <br />R=AREA/WETTED PERMITER 0.22 <br />V=(1.49/N)#(R".667)#(S".5)= 1.27 FEET/SEC <br />Q = A X V = 0.81 CFS <br />Q REQUIRED 0.78 <br />Collection Ditch CDA-1 will be a triangular channel 0.460 <br />feet deep with 3h:ly side slopes. with a freeboard of 0.3' <br />the total depth of collection ditch CDA-1 is 0.760 feet. <br />The flow velocity is slow enough that erosion will not be a <br />problem. <br />L~ <br />9-4 <br />