My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1991078
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1991078
>
2001-12-11_PERMIT FILE - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:33 PM
Creation date
5/5/2011 11:03:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 09 Protection of the Hydrologic Balance
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Sediment Pond B <br />RIPRAP SIZING - Spillway Cannel Across Top of Embankment <br />D50 = Size of Riprap <br />D50 = ((V Y S".171/7.58))"2 <br />D50 = Diameter in feet <br />V = Velocity <br />S = Slope <br />D50 = 0.133 feet 1.595 inches <br />DETERMINE VELOCITY OF FLOW DOWN 5:1 EMBANKMENT <br />ENTER DEPTH D 0.630 FEET <br />ENTER WIDTH W 12.000 FEET <br />ENTER SLOPE 5:1 S 0.200 EXPRESS AS DECIMAL <br />ENTER "N" N 0.040 EXPRESS AS DECIMAL <br />ENTER SIDE SLOPE t 2.000 SLOPE = X:1 <br />AREA=IW*D)+(X*D"2)= 8.35 FEET"2 <br />WETTED PERIMETER=(W)+2((XD"2 +D"2))".5 14.82 FEET <br />R=AREA/WETTED PERMITER 0.56 <br />V=(1.49/N)*(R".667)*(S".5)= 11.37 FT/SEC <br />• <br />Q = A X V = 94.97 CFS <br />Q REQUIRED 94.28 CFS <br />RIPRAP SIZING - Spillway Channel Down Face of Embankment <br />D50 = Size of Riprap <br />D50 = ((V K S".17)/7.58))"2 <br />D50 = Diameter in feet <br />V = Velocity <br />S = Slope <br />D50 = 1.301 feet 15.618 inches <br />The spillway for sediment pond B will be a trapezoidal <br />channel 12.0 feet wide and 1.25 feet deep <br />with a freeboard of 12" for a total depth of 2.250 <br />feet. Riprap, 6" minus, caill be placed in the spillway <br />channel across the top of the embankment and riprap, <br />16" minus, will be placed in the spillway channel down <br />the face of the embankment and in the inlet channels <br />that feed the pond. <br />• <br />9-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.