My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-04_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2011-05-04_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:17 PM
Creation date
5/5/2011 9:30:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
REVISION
Doc Date
5/4/2011
Doc Name
2011 Midterm Review Adequacy Review Letter
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
MT6
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Site: <br />Task description: Move Sediment Storage Pile for On-Site Disposal <br />Terror Creek Loadout Permit Action: 2011 Midterm Review Permit/Job#: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date: 29-Apr-11 <br />User: JRS <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />WMENT COST <br />Cat D9R - 9SU (2005) <br />405 <br />Semi-Universal <br />NA <br />1 per day <br />(CRG) <br /> Utilization % <br />Ownership Cost/Hour: $49.19 NA <br />Operating Cost/Hour: $110.89 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL Q UANTITIES <br />Initial Volume: 1,500 <br />Swell factor: 1.125 <br />Loose volume: 1,688 LCY <br />Source of estimated volume: Map 5; Page 2.05-3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />700.0 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,800 feet <br />2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Abbreviation: None <br />Filename: C059-003 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.