My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-04_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2011-05-04_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:17 PM
Creation date
5/5/2011 9:30:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
REVISION
Doc Date
5/4/2011
Doc Name
2011 Midterm Review Adequacy Review Letter
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
MT6
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Pagel of2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize/Demobilize Equipment for Reclamation <br />Site: Terror Creek Loadout Permit Action: 2011 Midterm Review Permit/Job#: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 018 State: Colorado <br />Date: 02-May-11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />EOUIPMENT TRANSPORT RIG COST <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $16.63 $18.37 $22.33 <br />Operating Cost/Hour: $44.38 $46.13 $50.07 <br />Operator Cost/Hour: $27.66 $27.66 $27.66 <br />Helper Cost/Hour: $0.00 $25.39 $25.39 <br />Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br />Description Unit Cost/hr/ unit Cost/hr/unit Size Cost/hr/ Cost/hr/ fleet Cost/ fleet <br /> (TONS) fleet <br />Cat D9R- 9SU 60.61 $49.19 $125.45 1 $174.64 $125.45 $250.00 <br />2005) <br />CAT 815F 22.97 $40.03 $88.67 1 $128.70 $88.67 $250.00 <br />Cat 621 G 35.55 $46.12 $117.55 1 $163.67 $117.55 $250.00 <br />CAT 14H 20.71 $34.52 $88.67 1 $123.19 $88.67 $250.00 <br />Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br />Seeder with Tractor <br />Subtotals: $718.46 $509.01 $1,250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip <br />Cost/hr/ fleet Return Trip <br />Cost/hr/ fleet <br />Flatbed Truck, 6x4, 45K GV W $106.06 1 $106.06 $106.06 <br />Fuel Tanker, 4x2, 170 HP $69.20 1 $69.20 $69.20 <br />Si.btotals: $175.16 $175.26 <br />Abbreviation: None <br />Filename: C059-018 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.