Laserfiche WebLink
Marr Mine and Loadout Apr 27, 2011 <br />2010 Reclamation Report <br />accordance with the approved water monitoring schedule as well as routine overall maintenance <br />of the site. As stated above (Item 7), Canada Thistle was treated at the Loadout during <br />September, 2009 - - no noxious weeds were reported during 2010. <br />Although backfilling of the Loadout Pond was delayed, KCC intends to reclaim the pond during <br />the following report period, 2011. <br />11.0 REVEGETATION SUCCESS EVALUATION <br />Revegetation success sampling was completed in 1999 on the pre-1986, 1995, and 1996 <br />reseeded areas. The results of this sampling are contained in a report prepared by ESCO <br />Associates Inc. dated February 2000. This evaluation included cover, annual production, shrub <br />density and species diversity/composition. Based on the sampling results, revegetation in these <br />areas satisfies the applicable revegetation success standards except for cover or shrub density <br />in the pre-1986 reclamation area. Kerr conducted managed grazing operations on reclaimed <br />areas and subsequently completed Year 9 revegetation success monitoring in 2005 and Year <br />10 during 2006. Results of the studies show that success has been achieved on those areas <br />that qualify for the Ten Year Reclamation Liability Period. Copies of the studies, "Kerr Coal <br />Company Revegetation Monitoring Report (2005 & 2006)" are on file with the DRMS. <br />During the summer seasons of 2009 and 2010, Mr. Kent Crofts of I.M.E., of Yampa Colorado <br />conducted the vegetation sampling and studies required for Growth Year 9 and Growth Year 10 <br />respectively. Two parcels at the mine, approximately 4 acres each that are not yet released and <br />the related Reference Area for the parcels were sampled. Additionally, the Loadout Site and its <br />respective Reference Area was studied for Growth Years 9 and 10. The vegetation study <br />yielded concerns of species diversification or lack thereof. Mr. Crofts, representing KCC is <br />currently communicating with the Division to reach a solution for this concern. <br />12.0 TOTAL DISTURBANCE SUMMARY <br />The following table summarizes the total disturbance at the Marr Mine and Loadout including <br />the reclaimed areas, areas to be reclaimed and the permanent facilities. <br />SUMMARY OF DISTURBANCE <br />Mine Area <br />Reclaimed less than 10 ears 0.0 ac <br />Reclaimed greater than 10 ears 349.6 ac <br />Areas to be Reclaimed 0.0 ac <br />Areas Approved as Permanent 40.1 ac <br />Areas Pending Permanent 0.0 ac <br />MINE TOTAL 389.7 acres <br />Loadout Area <br />Reclaimed 10 ears or less 0.0 ac <br />Reclaimed greater than 10 ears 6.9 ac <br />Areas to be Reclaimed and 0.2 ac <br />Areas A roved as Permanent 4.6 ac <br />LOADOUT TOTAL 11.7 acres