Laserfiche WebLink
Page 1 of 2 <br />tN <br />Colorado Division <br />., <br />of Reclamation, Mining <br />and <br />Safety Geology <br />Reclamation <br />Cost Estimate <br />Summary <br />ermit No. <br />C -92 -080 Prepared by: <br />TK <br />Date: <br />04/19/11 <br />nename: <br />Carbon Junction Mine Permit or job action: <br />MTR -04, after SL -04 amount proposed by DRMS <br />TASK LIST (DIRECT COSTS) <br />Liability <br />Form <br />Task <br />Cost, <br />remaining <br />Remaining <br />Remaining <br />Task no. <br />Task description <br />Used <br />Hours <br />100 0% (RN- <br />after SL -04, <br />hours <br />cost <br />) <br />North pit <br />001 <br />Bring downcast spoil from slope of N. Pit up to bench at N. Pit <br />excavate <br />19.78 <br />$3,068 <br />15% <br />2.97 <br />$460 <br />002 <br />Cut spoil at base of North Pit scarp, then push to pit <br />dozer <br />64.19 <br />$14,256 <br />15% <br />9.63 <br />$2,138 <br />003 <br />Move boulders /cobbles on N.Pit bench to inside edge of bench <br />dozer <br />26.00 <br />$5,884 <br />15% <br />3.90 <br />$883 <br />004 <br />Haul fill from PRSA to North Pit <br />truck /loader <br />88.51 <br />$47,492 <br />15% <br />13.28 <br />$7,124 <br />005 <br />Regrade North Pit fill to final contour <br />dozer <br />121.13 <br />$25,049 <br />15% <br />18.17 <br />$3,757 <br />006 <br />Haul &spread topsoil fill & growth medium f /t.s. pile #2 to N. Pit <br />scraper2 <br />215.29 <br />$39,537 <br />15% <br />32.29 <br />$5,931 <br />007 <br />Final -grade topsoil on North Pit <br />dozer <br />348.99 <br />$49,557 <br />15% <br />52.35 <br />$7,434 <br />008 <br />Revegetate North Pit <br />revege <br />16.70 <br />$6,001 <br />15% <br />2.51 <br />$900 <br />009 <br />Construct 3 ponds (sumps at base of N. Pit slope) <br />TR -12 est. <br />18.00 <br />$7,500 <br />15% <br />2.70 <br />$1,125 <br />010 <br />Compact N. Pit fill (most fill is topsoil with some blasted rock) <br />compact <br />66.56 <br />$5,006 <br />15% <br />9.98 <br />$751 <br />$203,350 <br />147.77 <br />$30,503 <br />North pit haul road, topsoil stockpile #2 and permanently reclaimed spoil area (PRSA) <br />012 <br />Haul fill from PRSA to North Pit haul road <br />truck /loader <br />11.06 <br />$4,162 <br />15% <br />1.66 <br />$624 <br />013 <br />Grade North Pit haulroad fill <br />grader <br />7.10 <br />$664 <br />15% <br />1.07 <br />$100 <br />014 <br />Haul topsoil from topsoil stockpile #2 to North Pit haul road <br />scraper2 <br />3.32 <br />$2,729 <br />15% <br />0.50 <br />$409 <br />015 <br />Regrade PRSA to final contour <br />grader <br />3.46 <br />$421 <br />15% <br />0.52 <br />$63 <br />016 <br />Regrade topsoil stockpile #2 <br />grader <br />2.07 <br />$252 <br />15% <br />0.31 <br />$38 <br />017 <br />Revegetate North Pit haul road, footprint of t.s. #2, PRSA <br />revege <br />18.50 <br />$6,648 <br />15% <br />2.78 <br />$997 <br />$14,876 <br />15% <br />6.83 <br />$2,231 <br />South pit drill pad <br />018 <br />Regrade South Pit drill pad <br />dozer <br />11.29 <br />$2,556 <br />15% <br />1.69 <br />$383 <br />019 <br />Haul topsoil from stockpile #2 to South Pit drill pad area <br />scraper2 <br />6.39 <br />$3,058 <br />15% <br />0.96 <br />$459 <br />020 <br />Finish -grade South pit drill pad <br />grader <br />2.69 <br />$145 <br />15% <br />0.40 <br />$22 <br />021 <br />Revegetate 3.5 -acre South Pit drill pad <br />revege <br />7.00 <br />$2,516 <br />15% <br />1.05 <br />$377 <br />$8,275 <br />4.11 <br />$1,241 <br />Carbon Junction Canyon channel <br />022 <br />Regrade C.J. Carry. Channel f/ 1962'to 922' per TR -12 profile <br />dozer <br />3.08 <br />$696 <br />15% <br />0.46 <br />$104 <br />023a <br />Excavate C.J. Canyon channel - hard digging <br />excavate <br />30.88 <br />$4,444 <br />15% <br />4.63 <br />$667 <br />023b <br />Excavate C.J. Channel - easy digging <br />excavate <br />28.59 <br />$2,047 <br />15% <br />4.29 <br />$307 <br />024 <br />Purchase filter rock and rock riprap for C.J. channel <br />spreadsheet <br />24.00 <br />$79,882 <br />15% <br />3.60 <br />$11,982 <br />025 <br />Install filter and riprap in C.J. Canyon channel <br />excavate <br />173.00 <br />$26,866 <br />15% <br />25.95 <br />$4,030 <br />026 <br />Purchase culvert for C.J. Canyon channel road crossing <br />TR -12 est. <br />8.00 <br />$9,903 <br />15% <br />1.20 <br />$1,485 <br />027 <br />Install culvert where channel crosses road <br />TR -12 est. <br />24.00 <br />$7,000 <br />15% <br />3.60 <br />$1,050 <br />028 <br />Surveying <br />TR -12 est. <br />16.00 <br />$4,500 <br />15% <br />2.40 <br />$675 <br />$135,338 <br />33.15 <br />$20,301 <br />Sediment pond #2 <br />031 a <br />Haul topsoil for fill & rev eg. f/ stockpile #7 to pond #2 <br />truck /loader <br />31.27 <br />$6,788 <br />15% <br />4.69 <br />$1,018 <br />031b <br />Regrade pond #2 fill <br />dozer <br />7.86 <br />$1,779 <br />15% <br />1.18 <br />$267 <br />031 c <br />Install riprap in drainage channel at pond #2 <br />truck /loader <br />0 <br />$67 <br />15% <br />0.03 <br />$10 <br />031d <br />Revegetate pond #2 <br />revege <br />1 <br />$460 <br />15% <br />0.19 <br />$69 <br />$9,094 <br />6.09 <br />$1,364 <br />Sediment pond #1 <br />037a <br />Backfill pond #1 with topsoil f/ stockpile #8 <br />scraper <br />78.22 <br />$19,610 <br />15% <br />11.73 <br />$2,942 <br />037b <br />Regrade pond #1 backfill <br />dozer <br />35.63 <br />$287 <br />15% <br />5.34 <br />$43 <br />037c <br />Revegetate pond #1 <br />revege <br />5.80 <br />$2,084 <br />15% <br />0.87 <br />$313 <br />$21,981 <br />17.95 <br />$3,297 <br />Page 1 of 2 <br />