My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981012 (45)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
_INSPECTION - C1981012 (45)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 6:47:31 AM
Creation date
5/2/2011 3:03:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company
Inspection Date
4/26/2011
Email Name
KAG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydrologic Balance <br /> Pond 7 remains full and the outlet gate was found closed. The operator is evaluating the need <br /> and potential future use of flocculent to assist in settling sediment in Pond 7. Pond 001, the <br /> mine dewatering pond, was dry and the pond liner had not been completed at the time of the <br /> inspection. Containments along the RDA conveyor were dry. Water levels in Pond S remain <br /> low and Pond 4 was observed dry. Culverts C47 and C20 were cleaned in the area east of the <br /> coal silos. Drainage in this area will be changed slightly with the recent approval of TR-55, <br /> Bates Portals. A culvert installed at the Jansen coal loadout under the rail line was buried at <br /> the inlet (yellow arrow) since it could defeat the approved sediment control plan of ditches and <br /> non-discharging sumps (photo below). <br /> i 1 n <br /> j y <br /> s�.a. <br /> Support Facilities <br /> Work continues as approved at the main mine site and at the Jansen coal loadout. The <br /> conveyor structure at the coal loadout is nearly complete, with the east loading hopper yet to be <br /> installed. Exhibit 40 of the approved permit provides details regarding the coal loadout. At the <br /> main mine site, the outer structure housing the hoist was in the process of assembly(photo <br /> below). <br /> 5 <br />