Laserfiche WebLink
Loader Worksheet Cont'd Task # 002 <br />Load Bucket Capacit <br />Page 2 of 2 <br />Total Travel Time: 0.8771 minutes <br />Total Cycle Time: 1.4021 minutes <br />Rated Capacity: 5.50 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95-100%) 0.975 <br />Adjusted Capacity: 5.36 LCY <br />Job Condition Correction Factors <br />Site Altitude: 9750 feet <br />Source <br />Altitude Adj: 0.84 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.70 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: I Loader(s) Total job time: 60.50 <br />Unit cost: $0.731 /LCY Total job cost: $7,073.00 <br />229.48 LCY/Hour <br />159.99 LCY/Hour <br />159.99 LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software