Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 005 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: SILVERTON <br />Total one-way travel distance: 6.00 miles <br />Average Travel Speed: 35.00 mph <br />Total Non-Roadable Mob/Demob Cost * $2,617.66 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** $7 17 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />0.17 0.17 <br />0.17 0.17 <br />0.50 NA <br />0.50 NA <br />1.34 0.34 <br />Total job time: 2.69 Hours <br />Total job cost: $2,624.83 <br />CIRCES Cost Estimating Software