Laserfiche WebLink
Mobilization Worksheet Cont'd <br />EOUIPMENT HAUL DISTANCE and Time <br />Task # 003 <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />1.50 1.50 <br />1.50 1.50 <br />0.50 NA <br />0.50 NA <br />4.00 3.00 <br /> Page 2 of 2 <br />MONTROSE <br />45.00 miles <br />30.00 mph <br /> <br />$1,278.51 <br />$198.36 <br />Total job time: 8.00 Hours <br />Total job cost: $1,476.87 <br />CIRCES Cost Estimating Software