My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-02_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-05-02_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:12 PM
Creation date
5/2/2011 10:03:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
5/2/2011
Doc Name
Letter & Application
From
Colowyo Coal Company
To
DRMS
Type & Sequence
MR108
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF'??to <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />*f <br />x,8,6 x 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 019 Date: 04 / 27 / 11 <br />Permittee: Colowyo Coal Company, L.P. <br />Street: 5731 State Highway 13 <br />City: Meeker <br />State: CO Zip Code: 81641 - <br />Brief Description of Revision: MR - 108 revises the post-mining topgraphy <br />within and adjancent to EP051 for proper <br />ties-ins with the current as-built for that area. <br />Public Notice Attached: Yes _ No ? (Required for PRs and TRs) <br />Bond Increase: Yes - Nov( Federal ? Non-Federal - Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed 0 .0 Acres <br />Permit 0 . 0 Acres <br />Affected (+/-) 0 . 0 Acres <br />Mineral Ownership - <br />Mineral Private 0 . 0 Acres <br />Mineral Federal 0 0 Acres <br />Surface Ownership - <br />Private Land 0 0 Acres <br />Federal Land 0 . 0 Acres <br />State Land 0 . 0 Acres <br />Mineral State (+/-) - - 0 . 0 Acres
The URL can be used to link to this page
Your browser does not support the video tag.