Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Not applicable. Host rock placed outside the portal will match the existing skree slope <br />which is devoid of soil and vegetation. The amended host rock deposit will simply add to <br />is existing feature an en in with the setting. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Not applicable. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />All existing site features will be retained as is. The added host-rock slope will blend in with <br />the existing skree slope which is characterized by lack of soil and vegetation. It will be <br />sloped to an appropriate angle in order to help bolster the skree slope and stall the <br />di°#ljrhanrp th rP is minimal rpelamation likaly assnriatari with cleanup of dehrlS/refusP_ <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Not appliGable ' The road is 2 Ca' - Inty Road and currently has a gate prohibiting access to <br />the mine Both the road and the gate will be retained in the future.