Laserfiche WebLink
<br />There will be a minimum of traffic created as a result of the proposed prospecting activities on site. <br />Approximately two standard sized passenger trucks will be used to transport personnel and equipment to <br />the project area, a fuel truck may also be relied upon and on occasion larger trucks for the transport of <br />equipment as needed. The amount of activity on site will be related to seasonal conditions. It is anticipated <br />that the work will be accomplished during a standard 5-day work week from late May, 2011 through <br />October, 2011. If activities continue through the winter months, the St. Sophia Holding Ltd, company will <br />coordinate with the County to address road maintenance and avalanche control. <br />Access to the Mountain Top project area is approximately 9 miles from the Town of Ouray. From Ouray, <br />the site is accessed using the following sequence of County Roads as follows; <br />Hwy 550 to CR 361 (approximately 0.25 miles) <br />Travel 7,45 miles on CR 361 to CR 26A <br />Travel approximately 1 mile on CR 26A to the Lower Mountain Top working pad <br />CR 26A is considered a 'primitive' road by Ouray County classification [Ouray County Road Standards: <br />Section 23.1 D(2)(0]. As such, maintenance is provided seasonally, therefore any out-of-season needs <br />would be coordinated directly with the County and assisted by the St, Sophia Holding Ltd, company. <br />The information provided herein was produced by Karmen King. If you have any questions or concerns, do <br />not hesitate to contact either Karmen King [(970) 565-02781 or Larry O'Connor directly. We appreciate this <br />opportunity in working with the County. <br />Sincerely, <br />1,7 sW%I <br />, a ++reri, J. O'Connor <br />''St. hia Holding Ltd. <br />10220 Hawkeye Circle <br />Reno, NV 89523 <br />(775) 848.6290 <br />2